Great clients, beautiful grounds, and a rock solid team made this collaborative project a joy to work on.

custom shower with subway tile, custom bench, shower skylight, and Schulter waterproofing

This was a rare project for us, in that we didn’t own every facet of the job. There was an incredibly talented craftsman (really no other word) that works at the winery who knocked out most of the interior carpentry and oversaw most of the mechanical and wiring. We focused on the envelope, and adopted some of the interior work.

Our scope included:

  • demolition

  • framing

  • siding/exterior carpentry

  • fenestration, flashing, and skylighting

  • metal roofing and downspouts

  • roofing repair

  • drywall

  • insulation

  • partial interior framing

  • waterproofing and tiling

shower waterproofing, custom wed bed, schluter kerdi board

Some notes on this project:

  • After the foundation was poured, we framed the structure and tied it in with the existing building

  • We repaired roofs, installed step flashing, and incorporated ventilation and drainage planes

  • We were able to source windows in about 5 weeks, as well as a velux skylight.

  • Openings and penetrations were meticulously flashed with Zip System’s fluid applied membrane

  • Siding is custom board and batten and exterior carpentry is predominantly a material called Extira

  • We used Mineral wool insulation throughout

  • Bathrooms were meticulously waterproofed using Schluter products and system compatible cements, adhesives, membranes, and drains